|
|
|
|
Hours
of Operation: Monday - Friday -
8:00 a.m. to 4:00 p.m. |

The
Hewitt Contracting Company Landfills and Borrow Pits Division
operates two facilities, one located on County Road 33 in Lake
County, FL., and the second located on
County Road 466A in Sumter County, FL. at the Lake County Line:
CREDIT APPLICATION,
COMPLETE AND RETURN VIA FAX
|
BOTH LOCATIONS HAVE A MINIMUM
DUMP FEE, SEE BELOW |
|
County Road 33 landfill
is a Class III landfill which can accept construction and demolition waste
as well as class III material. No
household garbage accepted. |
PLEASE USE OUR 466A LANDFILL WHILE OUR CR 33 LANDFILL IS TEMPORARILY CLOSED
CR 33 LANDFILL SCALE HOUSE
23141 County Road 33
Groveland, FL 34736
PHONE
352-326-5302
Fax 352-326-5826
|
County Road 466A landfill
is a construction and demolition waste
landfill only. No Household garbage or class III
material accepted. |
CR 466A LANDFILL SCALE
HOUSE
8979 County Road 466A
Wildwood, FL 34785
PHONE 352-259-0740
Fax 352-259-0871
|
County Road 466A Price List
($25.00 + Fuel Surcharge minimum dump fee) |
| Construction
Debris |
$4.50 Per Cubic Yard |
|
Clearing
Debris/Logs & Stumps (15" Diameter and Under |
6.00 Per Cubic Yard |
|
Clearing
Debris/Logs & Stumps (Over 15" Diameter) |
10.00 Per Cubic Yard |
|
No Tires or
class III material accepted (take these items to
CR33 landfill) |
|
County Road 33 Price List ($35.00
+ Fuel Surcharge minimum dump fee) |
| Class III Material |
$35.00 per
ton |
| Construction Debris |
6.50 Per Cubic Yard |
|
Clearing
Debris/Logs & Stumps (15" Diameter and Under |
4.00 Per Cubic Yard |
|
Clearing
Debris/Logs & Stumps (Over 15" Diameter) |
8.00 Per Cubic Yard |
|
Tires,
Un-mounted |
6.25 Each |
|
Tires,
Mounted |
10.00 Each
|
|
Truck
Tires, Un-mounted
|
15.00 Each |
|
Truck
Tires, Mounted |
30.00 Each
|
|
Large
Tires/Tractor-Heavy Equip Un-Mounted |
125.00 Each |
|
Borrow Pit Price List
(applies to both CR33 & CR466A borrow pits) |
|
Crushed Concrete / Road Base
*** |
$10.00 Per Ton |
|
Crushed Concrete / 67 Stone
*** |
22.00 Per Ton |
|
Topsoil *** |
5.25 Per Cubic Yard |
|
Sand (yellow to tan) |
4.00 Per Cubic Yard |
|
White Sandy Clay |
3.00 Per Cubic Yard |
|
Baseball Clay |
5.25 Per Cubic Yard |
|
Pre-mix Stabilizer |
3.25 Per Cubic Yard |
|
Bank Run Clay |
2.00 Per Cubic Yard |
|
Sandy/clay fill material |
2.00 Per Cubic Yard |
| Crushed
Conc. 57 Stone (33 Pit only limited Qty) |
19.00
Per Ton |
*** These products are
not always available, call for availability
All prices listed above will
have a fuel surcharge added based on the Department of Energy
Weekly Retail On-Highway
Diesel Price index. The surcharge will apply to each
item. This surcharge is to cover the fluctuating
cost of fuel used in the daily operation of the pit. In addition
to the fuel surcharge a 1% environmental fee will be added to the
fuel surcharge to cover the cost of meeting regulatory
agencies requirements. Example 10 CY of Construction Debris
brought to the landfill is invoiced at $4.50 per CY for a total
cost of $45.00, the DOE Price Index for that week was $4.30 per
gallon based on the surcharge
chart the surcharge is 16.55%. 16.55% plus 1% environmental
fee = total surcharge of 17.55%, in this case an increase of $7.90
on the service purchased.
Mini-Wheel
dump trucks are considered to be 18 Cubic Yards
Pick-up trucks are considered to be 3 Cubic Yards
Note:
All prices subject to change without prior notice. |
|