Borrow Pits and Landfills -  Clarence Lewis, Pit Manager - Phone: (352) 267- 0197
 

 

 

   Hours of Operation:   Monday - Friday -  8:00 a.m. to 4:00 p.m.

The Hewitt Contracting Company Landfills and Borrow Pits Division operates two facilities, one located on County Road 33 in Lake County, FL., and the second located on County Road 466A in Sumter County, FL. at the Lake County Line:
 

CREDIT APPLICATION, COMPLETE AND RETURN VIA FAX

BOTH LOCATIONS HAVE A MINIMUM DUMP FEE, SEE BELOW

County Road 33 landfill is a Class III landfill which can accept construction and demolition waste as well as class III material. No household garbage accepted.

PLEASE USE OUR 466A LANDFILL WHILE OUR CR 33 LANDFILL IS TEMPORARILY CLOSED

CR 33 LANDFILL SCALE HOUSE
23141 County Road 33
Groveland, FL 34736
PHONE 352-326-5302
Fax 352-326-5826

County Road 466A landfill is a construction and demolition waste landfill only. No Household garbage or class III material accepted.

CR 466A LANDFILL SCALE HOUSE
8979 County Road 466A
Wildwood, FL 34785
PHONE 352-259-0740
Fax 352-259-0871

 
County Road 466A  Price List   ($25.00 + Fuel Surcharge minimum dump fee)
Construction Debris    $4.50 Per Cubic Yard
Clearing Debris/Logs & Stumps (15" Diameter and Under      6.00 Per Cubic Yard
Clearing Debris/Logs & Stumps (Over 15" Diameter)      10.00 Per Cubic Yard
No Tires or class III material accepted (take these items to  CR33 landfill)

 
County Road 33  Price List   ($35.00 + Fuel Surcharge minimum dump fee)
Class III Material   $35.00 per ton
Construction Debris     6.50 Per Cubic Yard
Clearing Debris/Logs & Stumps (15" Diameter and Under     4.00 Per Cubic Yard
Clearing Debris/Logs & Stumps (Over 15" Diameter)     8.00 Per Cubic Yard
Tires, Un-mounted     6.25 Each
Tires, Mounted     10.00 Each 
Truck Tires,  Un-mounted     15.00 Each
Truck Tires, Mounted    30.00 Each 
Large Tires/Tractor-Heavy Equip Un-Mounted   125.00 Each
 
Borrow Pit Price List  (applies to both CR33 & CR466A borrow pits)
Crushed Concrete / Road Base   ***  $10.00 Per Ton
Crushed Concrete / 67 Stone  ***  22.00 Per Ton
Topsoil  ***    5.25 Per Cubic Yard
Sand (yellow to tan)    4.00 Per Cubic Yard
White Sandy Clay    3.00 Per Cubic Yard 
Baseball Clay    5.25 Per Cubic Yard
Pre-mix Stabilizer    3.25 Per Cubic Yard
Bank Run Clay    2.00 Per Cubic Yard 
Sandy/clay fill material    2.00 Per Cubic Yard
Crushed Conc. 57 Stone (33 Pit only limited Qty)  19.00 Per Ton

***  These products are not always available, call for availability

All prices listed above will have a fuel surcharge added based on the Department of Energy Weekly Retail On-Highway Diesel Price index.  The surcharge will apply to each item.  This surcharge is to cover the fluctuating cost of fuel used in the daily operation of the pit. In addition to the fuel surcharge a 1% environmental fee will be added to the fuel surcharge  to cover the cost of meeting regulatory agencies requirements.  Example 10 CY of Construction Debris brought to the landfill is invoiced at $4.50 per CY for a total cost of $45.00, the DOE Price Index for that week was $4.30 per gallon based on the surcharge chart the surcharge is 16.55%.  16.55% plus 1% environmental fee = total surcharge of 17.55%, in this case an increase of $7.90 on the service purchased.

Mini-Wheel dump trucks are considered to be 18 Cubic Yards
Pick-up trucks are considered to be 3 Cubic Yards

Note: All prices subject to change without prior notice.