|
LANDFILLS AND BARROW PITS
The Hewitt Contracting Company Landfills and Borrow Pits Division operates two facilities, one located on County Road 33 in Lake County, FL., and the second located on Moyer Loop in Sumter County, FL. at the Lake County Line:
CREDIT APPLICATION, COMPLETE AND RETURN VIA FAX
BOTH LOCATIONS HAVE A MINIMUM DUMP FEE, SEE BELOW |
County Road 33 landfill is a Class III landfill which can accept construction and demolition waste as well as class III material. No household garbage accepted. |
PLEASE USE OUR 466A LANDFILL WHILE OUR CR 33 LANDFILL IS TEMPORARILY CLOSED
CR 33 LANDFILL SCALE HOUSE
23141 County Road 33
Groveland, FL 34736
County Road 466A landfill is a construction and demolition waste landfill only. No Household garbage or class III material accepted. |
CR 466A LANDFILL
262 Moyer Loop
The Villages, FL 32163
PHONE 352-259-0740
Fax 352-259-0871
County Road 466A Price List ($25.00 + Fuel Surcharge minimum dump fee) (Prices effective 1/1/2024) |
|
Construction Debris |
$10.50 Per Cubic Yard |
Roofing Debris |
12.25 Per Cubic Yard |
Clearing Debris/Logs & Stumps (15" Diameter and Under |
12.75 Per Cubic Yard |
Clearing Debris/Logs & Stumps (Over 15" Diameter) |
15.50 Per Cubic Yard |
Yard Waste | 12.25 Per Cubic Yard |
No Tires or class III material accepted |
County Road 33 Price List (This Landfill is currently closed) |
|
Class III Material |
|
Construction Debris |
|
Clearing Debris/Logs & Stumps (15" Diameter and Under) |
|
Clearing Debris/Logs & Stumps (Over 15" Diameter) |
|
Tires, Un-mounted |
|
Tires, Mounted |
|
Truck Tires, Un-mounted |
|
Truck Tires, Mounted |
|
Large Tires/Tractor-Heavy Equip Un-Mounted |
|
*** These products are not always available, call for availability All prices listed above will have a fuel surcharge added based on the Department of Energy Weekly Retail On-Highway Diesel Price index. The surcharge will apply to each item. This surcharge is to cover the fluctuating cost of fuel used in the daily operation of the pit. In addition to the fuel surcharge a 1% environmental fee will be added to the fuel surcharge to cover the cost of meeting regulatory agencies requirements. Example 10 CY of Construction Debris brought to the landfill is invoiced at $4.50 per CY for a total cost of $45.00, the DOE Price Index for that week was $4.30 per gallon based on the surcharge chart the surcharge is 16.55%. 16.55% plus 1% environmental fee = total surcharge of 17.55%, in this case an increase of $7.90 on the service purchased. Mini-Wheel dump trucks are considered to be 18 Cubic Yards |
Corporate Office: 3839 County Road 48 Okahumpka, FL. 34762 Phone: (352) 787-5651 Fax: (352) 787-5199 |
Corporate Mailing Address: Hewitt Properties, LLC P.O.Box 490697 Leesburg, FL 34749-0697 Email |